Video Conferencing Checklist

March 4, 2018 | By 246@dmin | Filed in: Uncategorized.

What do you want to achieve?

  • Broadcast to Live – Watch and Listen to a Site
  • Live Streaming – From a Web Site – Watch and Listen
  • Multipoint – Three or More Websites Q & A
  • Multipoint – three or more – broadcast broadcasts into any subset of satellites other than watching and listening.
  • Live and switched session for later editing and distribution
  • People with video and voice and data management for participants – e.g. Share documents, drawings with or without live editing, and check for changes made. With whom would you like to communicate via video conferencing?
  • With your prospects System usage frequency
  • Ad hoc
  • Annual (
  • min / max) estimated usage
  • Weekly
  • Monthly
  • Quarterly Installation Type
  • Static Installation – a Selected Room
  • Desktop Location – Mobile Roll-Out System –
  • Offsite Facilities Needed – A dedicated Video Conferencing Device Options
  • Recording, editing and distribution in printed format (CD / DVD)
  • Recording, editing and dissemination softcopy (web cast)
  • One or more time zones pre-recorded stream [19659003] A log that has been listening and listening when
  • T bb one or two of people (group video conferencing groups – eg. Design teams, local consultancy)
  • Multiple Participants on Three or More Sites
  • ISDN 1
  • ISDN 2
  • ISDN 30
  • LAN – Fiber
  • LAN Wireless Type?
  • WAN bandwidth?
  • VPN bandwidth?
  • Internet access, dial-up connection 56k
  • Internet access, 128 Mbps telephone number
  • Internet access, broadband 1Mb
  • Internet access, Broadband 2Mb
  • Satellite connection
  • Fiber / Cable Connection
  • T1 / T2 / T3 / T4 (DS-1 / DS-2 / DS-3 / DS-4)
  • OC-3 / OC-12 / OC-38 Impact on your system – take into account
  • Load bandwidth
  • Used and unused circuit capacity [maxbandwidthusageandavideconferencecall
  • Content ratio
  • Speed ​​
  • Video quality – predominantly static )
  • Hardware on display
  • Hardware on distribution points Points to consider
  • Budget
  • What do you currently spend for flights / travel / accommodation years nte l?
  • Expiration Expiration Expiry
  • Leasing Options
  • IT Infrastructure
  • Cost and Schedule of Increased Capacity and Hardware, if Needed
  • Source by SBOBET


    Leave a Reply

    Your email address will not be published. Required fields are marked *